top of page

St. Albans II, Pt. 2

Bathroom Renovation

The goal for this project was to get this bathroom out of the 80's and make space to move the washer & dryer from the garage to the house.  In order to achieve those goals the bathroom was mostly gutted, the wall it shared with a hall closet removed and the closet door opening was enclosed.  In place of the old fiberglass tub and surround is now a modern tiled walk in shower that includes a wall niche and corner bench seat.  The shower was finished with floor to ceiling glass panels and a glass door.  Large ceramic tile flooring was installed and the vanity was replaced with a space saving pedestal sink flanked by new sconce lighting.  By expanding the floor print of the bathroom we were able achieve the goal of moving the washer & dryer inside and had room for cabinets and a small countertop. New direct mount LED ceiling lights and an exhaust fan were also installed.

20221207_092638
20221207_092548
20221207_092628
20221207_092710
20221207_092754
20221207_092717
20221207_092725
20221207_092520
bottom of page